References
Substations
Connecting the Ballószög solar power plant to the grid
Within the framework of a project led by our Substations business unit, a state-of-the-art photovoltaic power plant with a capacity of nearly 50 MW wa...
DetailsGrid Connection of the Bodroghalom solar power plant
In 2025, two solar power plants with a combined capacity of 64.5 MWp were constructed near the village of Bodroghalom as part of an investment by Zemp...
DetailsDevelopment of the Őrmező 132/11 kV Substation
Our Substations business unit implemented the Őrmező 132/11 kV substation project, which was developed to meet the increasing capacity demand of ELMŰ ...
DetailsGrid Connection of the Fehérgyarmat Solar Power Plant
A solar power plant with a nominal connection capacity of 49.999 MVA was implemented in the outskirts of Fehérgyarmat as part of an investment by 50 M...
DetailsNetwork
Gyöngyöstarján - Design and construction of the grid connection of a 5x500 kW solar power plant
In 2022, we carried out the design and implementation of the grid connection for five 500 kW solar power plants....
DetailsVasmegyer - 22 kV grid connection for solar farm
Over three years, we carried out several phases of rebuilding work on the 22 kV grid connection of a previously completed solar farm....
DetailsBodroghalom - Connection of 64.5 MWp solar farm to the grid
During 2025, 2 solar power parks with a total installed capacity of 64.5 MWp were established near the village of Bodroghalom, by Zemplén Solar Park K...
DetailsTápióbicske - Design and construction of the grid connection of a 4x500 kW solar power plant
In 2022, we carried out the full design and construction of the grid connection of 4 solar farms, each with a capacity of 500 kW....
DetailsTransmission lines
Connecting Bodroghalom solar power plant to the grid
Under challenging terrain conditions, we constructed the new transmission line on the site of a drained marsh, extending to the solar power plant subs...
DetailsSajószöged-Kisvárda-Tiszalök 220 kV overhead line, phase conductor replacement
The Transmission Line Business Unit, relying solely on its own resources, completed the 220 kV transmission line reconstruction work in 2025 on behalf...
DetailsConstruction of 132 kV overhead line to Szikszó substation
Our company's Transmission Line Business Unit built a new double-circuit 132 kV transmission line to the Szikszó 132/22 kV substation in Szikszó in 2...
DetailsDunaújváros 132 kV overhead line construction
In 2023 we were awarded the contract through a public procurement tender. In the Dunaújváros area, we constructed a new double-circuit transmission li...
DetailsIndustry & Building
Further expansion of Nestlé production capacity in Bükk
The successful cooperation during the Turul-4 project, both on the part of the investor and the general contractor, confirmed the professional reliabi...
DetailsExpansion of Nestlé production capacity in Bükk
Our Industry and Building business unit took part in an invited tender titled “Expansion of Nestlé Bük production capacity.” Based on the decision of...
DetailsEnergy modernisation of Hotel Vision Budapest
Our hotel project in the heart of Budapest involved the construction of the entire electrical infrastructure of a modern, high-tech facility....
DetailsDÜRR BMW Debrecen - power supply of technological equipment
Our Industry and Building business unit's expert team implemented a power supply and electrical project at the Debrecen car factory to the highest qua...
Details