Our Industry and Building business unit took part in an invited tender titled “Expansion of Nestlé Bük production capacity.”
Based on the decision of the investor, Nestlé Hungária Ltd., our company was awarded the full-scope electrical construction works. We signed a contract for the project’s implementation in spring 2021 with the general contractor, Synergy Construction Hungary Ltd.
Based on the decision of the investor, Nestlé Hungária Ltd., our company was awarded the full-scope electrical construction works. We signed a contract for the project’s implementation in spring 2021 with the general contractor, Synergy Construction Hungary Ltd.
As part of the project, as the electrical contractor of the Turul-4 production hall, we established a medium and low voltage general-purpose electrical network, built a general-, security-, and emergency lighting system, and implemented several low-voltage systems (like fire alarm, access control, CCTV, IT) in the 14,000 m2. building.
Area: 13.800 m2
Delivery date: April 2021 - November 2022
Technical content:
- MV cabling;
- design in 2D and 3D model space;
- complete establishment of LV energy distribution network;
- production and installation of distribution equipment;
- complete construction of general lighting;
- complete construction of security lighting;
- fire alarm system;
- access control system;
- complete construction of LAN and wifi network;
- CCTV system.