Under challenging terrain conditions, we constructed the new transmission line on the site of a drained marsh, extending to the solar power plant substation. We also established the possibility of an optical (fiber-optic) connection both towards ÉMÁSZ and MAVIR in 2025. Spectris Hungary Kft. was the client of the project.
Technical content:
Károlyfalva-Kisvárda 132 kV OHL connecting to BHAL substation
- 2 pcs Budapest-II.1 type tower
- foundations
- tower assembly and erection
- stringing
Earthing wire replacement to OPGW on Károlyfalva-Kisvárda 132 kV OHL
- 46,4 km length
- 15 junction boxes