The project in Ballószög was carried out by SPIE Hungaria Kft. Our scope included planning, permitting as well as installation of the connection to the network.
In addition to the Network Business Unit, our Substation and Transmission Business Units also contributed to the implementation.
The tasks of the Grid Business Unit during the construction of the 22 kV grid connection were as follows:
"D" auxiliary plant:
- dismantling of 2 poles,
- installation of 45 poles,
- 2963 metres of MV overhead line network,
- 130 metres of LV cable,
- 66 metres of MV cable,
- installation of 3 pole-mounted disconnectors,
- construction of 1 pole-mounted transformer station.
"B and C" auxiliary plant:
- dismantling of 1 pole,
- installation of 24 poles,
- 1,395 metres of MV overhead line network,
- 158 metres of LV cable,
- installation of 2 pole-mounted disconnectors,
construction of 1 pole-mounted transformer station.
Solar power plant connections
In recent years, we have completed a number of projects across the country related to the connection of solar power plants to the grid. Our work has involved the connection of small power plants, from design through construction to commissioning. During the implementation of the projects, we paid particular attention to technical compliance and grid security. Our experience enables us to offer efficient and reliable solutions for the integration of renewable energy generation.